REA PHASE 3 ROUND I – SIMIYU

Project: REA PHASE 3 ROUND I – SIMIYU

Title:

Description:

REA PHASE 3 ROUND I – SIMIYU

Management of Supply and installation of medium and low voltage lines, distribution transformers and connection of customers connection in SIMIYU region on Turnkey Basis phase III

a. Construction of 589.401km of 33kV Medium Voltage

Distribution Lines to supply power to villages of Bariadi,

Busega, Itilima, Maswa and Meatu Districts.

b. Construction of 527.237km of Low Voltage Lines to supply

power to villages of Bariadi, Busega, Itilima, Maswa and

Meatu Districts.

c. Installation of distribution Transformers in Bariadi, Busega,

Itilima, Maswa and Meatu Districts as follows;

i. 33 x 100kVA, 33/0.4/0.23kV

ii. 203 x 50kVA, 33/0.4/0.23kV

d. Installation of Load Breaker Switch (LBS) for Medium Voltage Lines(s) Isolation 4Nos

e. Installation of Autoreclosures for Medium Voltage Lines(s) Isolation 4Nos

f. Customer connections in Bukombe, Bariadi, Busega, Itilima, Maswa and Meatu Districts as follows;

i. Single phase customer connection 6,107 Nos

ii. Three phase customer connection 241 Nos

g. Installation of Ready boards to customers in Bariadi, Busega, Itilima, Maswa and Meatu Districts 250Nos